|PROJECT: (Name and address) |DIRECTIVE NUMBER: 001 |OWNER: |

| | |ARCHITECT: |

| | |CONSULTANT: |

| | |CONTRACTOR: |

| | |FIELD: |

| | |OTHER: |

|Blank Documents |DATE:       | |

|      |CONTRACT FOR: General Construction | |

| | | |

|TO CONTRACTOR: (Name and address) |CONTRACT DATED: | |

|      |ARCHITECT’S PROJECT NUMBER:       | |

|      | | |

| | | |

You are hereby directed to make the following change(s) in this Contract:

(Describe briefly any proposed changes or list any attached information in the alternative)

     

PROPOSED ADJUSTMENTS

1. The proposed basis of adjustment to the Contract Sum or Guaranteed Maximum Price is:

| |• Lump Sum decreased of $ 0.00 |

| |• Unit Price of $       per       |

| |• As provided in Section 7.3.3 of AIA Document A201–2007 |

| |• As follows:       |

2. The Contract Time is proposed to (be adjusted). The proposed adjustment, if any, is (an increase of 0 days).

|When signed by the Owner and Architect and received by the Contractor, this document becomes | |Contractor signature indicates agreement with|

|effective IMMEDIATELY as a Construction Change Directive (CCD), and the Contractor shall proceed| |the proposed adjustments in Contract Sum and |

|with the change(s) described above. | |Contract Time set forth in this CCD. |

| | | |

|      | |Northwestern University | |      |

|ARCHITECT (Firm name) | |OWNER (Firm name) | |CONTRACTOR (Firm name) |

|      | |2020 Ridge Avenue, Suite 250 | |      |

| | |Evanston, IL 60208 | | |

|ADDRESS | |ADDRESS | |ADDRESS |

| | | | | |

|BY (Signature) | |BY (Signature) | |BY (Signature) |

|      | |      | |      |

|(Typed name) | |(Typed name) | |(Typed name) |

|      | |      | |      |

|DATE | |DATE | |DATE |

Download